case studies

Mine Cerro Prieto, Mexico

Location
Cucurpe, Sonora
Year
2019

Project Details

The Cerro Prieto Project, located in the Cucurpe Mining District, Sonora, Mexico, is comprised of severa mineral concessions covering approximately 6879ha. The Cerro Prieto Project is 52 road kilometers from the regional center of Magdalena de Kino and 150 kilometers northeast of the city of Hermosillo.

Cerro Prieto commenced small-scale trial mining and leaching in December 2013. During the three and nine months ended September 30, 2014 Cerro Prieto produced 1,076 and 4,174 ounces of gold, respectively. The Company is working to ramp-up mining operations to commercial production rates.

Heap leach pads consist of a geomembrane with an overlying drainage system, and then a heap, a large of precious metal bearing ore or waste rock above. A cyanide or sulfuric acid solution is sprayed on top of the ore, leaches through it reacting with the metals, and carries the solution to the underlying drainage system where its collected in a sump. Separation of the ore from the leachate occurs at an on-site processing plant. The leaching solution is then renewed, and the process is repeated until it is no longer economical.

The liner placed at the bottom and around the sides of the pad prevents pregnant leach solution leaks and stop chemicals from leaking into the soil and contaminating groundwater. The geomembrane utilized for these liners must be capable of withstanding the excessive weight of stacked ore, the continuous application of corrosive chemicals, and harsh weather conditions over the long term.

Property

Weighting

HDPE

LLDPE

fPP-R

PVC

CSPE-R

Chem. Resist.

10550330330110440

Durability

552531531515420

UV Stab.

552542042015525

Shear Strength

10550550440440440

Stress Crack

10220550550550550

Seameability

8324432432540432

Seam Behavior

6424424318212318

Strength

452041631228312

Elongation

7321428321535321

Tear

10550550330330330

Puncture

10550550220550220

Impact

8540540324540324

Solu. Diffusion

8540432432216432

Constructability

8324432432540432

Benefit

n/a463469376381396

Cost/m2

n/a10.0010.5011.259.0013.00

B/C ratio

n//a

46.30

44.70

33.40

42.30

30.50

Tabla 1. Matriz Coste/Beneficio para un patio de lixiviación (ref., Geosynthetic Applications Used in Heap Leach Mining by George R. Koerner)

The use of a Benefit/Cost selection Matrix (GRI White Paper #12) appoint HDPE geomembranes as the best option for a Heap Leach Pad. For all that reasons Atarfil HD 1.00mm geomembrane was selected as the client needed a geomembrane with high chemical resistance, long lifetime, as well as good mechanical properties.